Professional Installation

Installation
Instructions

Complete guide for proper installation of ICR Solution flooring systems. Follow these steps to ensure optimal performance and longevity.

01 · Surface Preparation02 · Application Process03 · Safety & Environment04 · Technical Support

Step 01

Surface Preparation

Proper surface preparation is the foundation of a durable flooring system. Never skip or rush this stage — adhesion failures are almost always caused by inadequate substrate prep.

01

Cleaning & Degreasing

  • Remove all dust, dirt, oil, and contaminants
  • Use appropriate degreasers for chemical residues
  • Sweep and vacuum thoroughly before proceeding
  • Allow surface to dry completely after cleaning
02

Mechanical Preparation

  • Shot blast or diamond grind the substrate
  • Achieve CSP 2–4 profile for proper adhesion
  • Remove all laitance, sealers, and coatings
  • Vacuum blast for confined or sensitive areas
03

Moisture Testing

  • Test moisture vapour emission rate (MVER)
  • MVER must be below 3 lb/1000 ft² / 24 h
  • Relative humidity: max 80% in slab
  • Use moisture barrier primer if limits are exceeded
04

Crack & Defect Repair

  • Route and clean all cracks before filling
  • Use ICR polyurethane joint filler for dynamic cracks
  • Repair spalls and bug holes with epoxy mortar
  • Allow all repairs to cure before priming

Pre-Application Checklist

Surface free of contamination
Correct mechanical profile achieved (CSP 2–4)
Moisture levels within acceptable range
All cracks and defects repaired and cured
Temperature and humidity within specification
All tools and materials ready for priming

Step 02

Application Process

Proper application technique is critical for achieving optimal performance and appearance of your flooring system. Each layer must be applied in the correct order with the correct timing.

01

Primer Application

Mixing

  • Mix components thoroughly for 3–5 minutes
  • Use a mechanical mixer for best results
  • Scrape sides and bottom of container
  • Ensure complete colour uniformity before applying

Application

  • Apply at recommended coverage rate
  • Use brush, roller, or spray equipment
  • Maintain wet edge during application
  • Allow proper cure time before next coat
02

Base Coat

Preparation

  • Ensure primer is fully cured
  • Check for defects or contamination
  • Verify environmental conditions
  • Prepare all tools and materials

Installation

  • Mix base coat components thoroughly
  • Apply in thin, even coats
  • Use proper application tools
  • Maintain consistent thickness
03

Top Coat Finishing

Timing

  • Apply after base coat cure window
  • Do not exceed maximum recoat time
  • Monitor environmental conditions
  • Plan for uninterrupted application

Final Application

  • Use recommended application tools
  • Maintain consistent film thickness
  • Avoid over-working the material
  • Allow full cure before traffic

Temperature

Substrate10–32°C
Ambient10–32°C
Material18–29°C
Min. above dew point3°C

Humidity

Relative humidity< 85%
SurfaceNo condensation
During cureMonitor continuously
If neededDehumidify

Timing

Pot life20–45 min
Recoat window4–24 h
Light traffic24 h
Full cure7 days

Quality Control

Film thicknessMonitor per coat
Defect checkBetween coats
ConditionsDocument throughout
Adhesion testAfter prime

Step 03

Safety & Environmental Conditions

Strict adherence to safety protocols and environmental conditions is essential for successful installation and worker safety.

Critical Safety Requirements

Personal Protective Equipment

  • Safety glasses with side shields
  • Chemical-resistant gloves (nitrile or neoprene)
  • Respirator when required by SDS
  • Non-slip safety footwear
  • Long sleeves and pants
  • Hard hat in industrial environments

Ventilation Requirements

  • Ensure adequate ventilation at all times
  • Use mechanical ventilation if needed
  • Monitor air quality during application
  • Maintain airflow throughout cure period

Environmental Conditions

Temperature

Ambient temperature10°C – 32°C
Substrate temperature10°C – 32°C
Material temperature18°C – 29°C
Min. above dew point3°C

Humidity & Moisture

Relative humidity< 85%
Surface moistureNone visible
During applicationNo precipitation
MonitoringThroughout install

Site Preparation

  • Secure work area
  • Post safety signage
  • Ensure adequate lighting
  • Clear emergency exits

Material Handling

  • Store materials properly
  • Handle with care
  • Keep SDS sheets on site
  • Dispose of waste correctly

Emergency Procedures

  • Know emergency contacts
  • Have eyewash station ready
  • Keep first aid kit accessible
  • Plan evacuation routes

Air Quality

  • Monitor VOC levels
  • Use air monitoring equipment
  • Ensure fresh air supply
  • Follow exposure limits

Important Safety Notes

Before Starting Work

  • Review all Safety Data Sheets (SDS)
  • Conduct safety briefing with all personnel
  • Verify all safety equipment is available and functional
  • Establish emergency communication procedures

During Installation

  • Never work alone in confined spaces
  • Take regular breaks in fresh air
  • Report any adverse health effects immediately
  • Follow all local safety regulations and codes

Step 04

Technical Support & Resources

Our technical team is available to assist with installation questions, provide on-site support, and ensure your project succeeds.

01

Technical Hotline

Speak directly with our technical experts for immediate assistance with installation questions.

  • Monday – Friday: 09:00–17:00
  • Emergency support available 24/7
02

Email Support

Send questions, photos, or project specs for comprehensive written technical guidance.

  • Response time: within 4 hours
  • Include project details and photos
03

Documentation

Access installation manuals, technical data sheets, and safety data sheets for all products.

  • Complete installation manuals
  • Product & safety data sheets (SDS)

On-Site Technical Support

For complex or critical installations our specialists can provide on-site supervision and training.

  • Pre-installation consultation
  • On-site technical supervision
  • Crew training and certification
  • Quality control inspection
  • Post-installation support

Training & Certification

Enhance your team's capabilities with our comprehensive training programs and certification courses.

  • Installation technique training
  • Safety protocol certification
  • Product knowledge seminars
  • Troubleshooting workshops
  • Continuing education credits